Stage 1: Odesa, Mykolaiv, Kherson oblasts. Stage 2: Zaporizhzhia and Donetsk oblasts. Irrigation systems: Inhulets, Lower Dnister, Priazhivska and others. Water transfer capability between oblasts from three main rivers.
Southern Ukraine Interregional Water Grid
Massive water transfer system connecting Dnister, Southern Bug, and Dnipro rivers to prevent regional water crisis
€3.5-4B
Project Cost
2.5 million people
Beneficiaries
National
Region
Back to Catalog
About Project
About Community
Southern oblasts of Ukraine require large-scale water supply infrastructure to prevent potential regional water crisis.
General Information
Result: 1.5 million hectares equipped with irrigation systems; food and water security for over 2.5 million people. Estimated Stage 1 cost: €3.5-4 billion.