PlannedEnergy

Construction of a highly maneuverable generation based on the complex Gas piston generators with a total capacity of 50 MW

Comprehensive modernization of Chernihiv heating system

Construction of a highly maneuverable generation based on the complex Gas piston generators with a total capacity of 50 MW
€56 million
Project Cost
285,000 people
Beneficiaries
Frontline Territories
Region
UrgentEnergy Efficiency
DREAM-UA-CHER-005
Back to Catalog

About Project

Construction a highly maneuverable 50 MW gas piston generator complex at Chernihiv CHPP to improve operational efficiency and financial performance through grant funds or technical assistance. Technological Parameters: Utilizes a 50 MW complex at Chernihiv CHPP (5 generation units ~10MWe each). Project Strengths: Utilizes a 50 MW gas piston generator complex at Chernihiv CHPP for efficient and flexible electricity generation, lower maintenance cost.

About Community

Chernihiv is one of the most ancient cities in Ukraine with 1300-years history and historical monuments of the 10-18th centuries preserved. Regional center in the north of Ukraine, with area 78.6 km², 150 km from Kyiv. Population is 285,000. Since 2024 Chernihiv is a member of Eurocities, since 2024 – a member of ALDA, since 2025 – a member of SUN4Ukraine projects as a part of Mission Cities for Climate Neutrality.

General Information

Chernihiv Heating Scheme until 2034 for the comprehensive modernization of heating system was developed in cooperation with USAID. Priority areas: construction of high-flexibility generation (total capacity of 50 MW); construction of a waste processing facility with SRF fuel production; looping project of Chernihiv CHPP heat networks with the networks of eight gas boiler houses; connection of heat networks to a new boiler house based on renewable energy sources; installation of individual heating substations; modernization of boiler houses with installation of heat recovery units.