The project provides for the arrangement of the premises for the central heating station (capacity - 40.0 MW), installation of three heating network circulation pumps and three heat exchangers for the efficient use of a modular mobile boiler house received from NEFCO. Design and cost estimate documentation has been developed. Project Implementation Terms: 14 months.
The Construction of the New Central Heating Station
Ensuring uninterrupted heating services for 52,000 residents of Kremenchuk
About Project
About Community
Kremenchuk is a key industrial, logistics and humanitarian hub in Central Ukraine. The community has an area of 165.1 km² and a population of about 250 thousand persons, of which more than 30 thousand are internally displaced persons. The community has a developed social and educational infrastructure, which includes 36 secondary schools (including 4 private schools), 57 preschools, 6 out-of-school educational institutions, 8 vocational schools and 11 higher education institutions.
General Information
PROJECT FUNCTIONS: Ensuring uninterrupted access to heating services for 52 thousand residents of the town of Kremenchuk. Optimization of the heat generating facilities locating to improve the heat supply safety and reliability for the residents in the left-bank part of the town.